Kharkov Transition Home Phase 1
- The site can house a total of up to 20 graduates. This will give the graduates substantially more room than they had in the orphanage.
- In the first year, the larger house will be used to house girls and the CCP supervisor. The smaller house will be used to house boys.
- Property is large enough for either additions to current homes or a third home.
- Convenient location — 15 minutes walk from metro stop and 5-10 minutes to down town by car. This is critical as the young men and women must get to different locations within the city on a daily basis.
- Homes will be built / finished to reflect quality (but not extravagance). Our goal is to inspire future leaders and we want to teach them a respect for value.
Kharkov Transition Home Phase 2


One of the workers connecting heating pipes (boiler room)


Viessman, natural gas heating furnace for radiators and hot water


Heating pipes (water) in the basement floor.


Basement floor - heating pipes covered with 4 inch of special concrete mix


2 guys are working on main entrance roof. Cold!


st floor room - heating radiator(running hot water) under window.


Metal staircase 1st - 2nd floor. We are making wooden steps.


2nd floor. Staircase. We have such staircases in the house.


Upper floor - heating radiator under the window.


Working on the sewage pipes. Upper floor restroom.

2nd floor room. Heating radiator under roof window (skylight).
|